S11 Hard finish wall plaster 20KG
INSTRUCTIONS FOR USE
STORAGE:
- Sprinkle 20kg ‘S11’ Hard Finish Wall Plaster into approximately 12 litres of clean portable water in a clean mixing drum.
- Allow ‘S11’ Hard Finish Wall Plaster to soak for approximately 5 minutes.
- Mix ‘S11’ Hard Finish Wall Plaster thoroughly using a mechanical mixer until a smooth even gauge is achieved that is free from unmixed plaster or residue of older batches.
APPLICATION:
- Apply ‘S11’ Hard Finish Wall Plaster with a hand trowel to clean backgrounds free from oil, grease, wetting agents, dust and loose material.
- A light wetting down of the background may be required depending on the background type and site conditions.
- The setting time of ‘S11’ Hard Finish Wall Plaster is approximately 60 minutes.
- ‘S11’ Hard Finish Wall Plaster ia suitable for standard sand lime cement float coats and is able to cover approximately 13 m2 per bag.